This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
renewing_a_contract [2020/04/28 11:58] – lisa.maloney | renewing_a_contract [2025/02/12 16:57] (current) – tina.robles | ||
---|---|---|---|
Line 2: | Line 2: | ||
- | To renew a contract, open the contract | + | To initiate |
- | {{:pasted:20180830-123836.png}} | + | - Locate and open the specific contract due for renewal. |
+ | - Navigate to the " | ||
+ | - Select the " | ||
+ | |||
+ | {{:pasted:20240806-160748.png}} | ||
---- | ---- | ||
- | This will enable the fields in the Date Info section as well as the Contract Name in the Version Info section. | + | Upon initiating |
- | {{:pasted:20181120-134820.png}} | + | - The Date Information section becomes editable. |
+ | - The Contract Name field in the Version Information section is enabled for modification. | ||
+ | - Existing data is carried forward to the renewal, including: | ||
+ | * Product portfolio | ||
+ | * Lump sum items | ||
+ | * Distributor information | ||
+ | * Other relevant contract details | ||
+ | |||
+ | |||
+ | During the renewal process, the following modifications can be implemented: | ||
+ | |||
+ | * Product catalog: | ||
+ | * Pricing structure adjustments | ||
+ | * Distributor network modifications: | ||
+ | |||
+ | {{:pasted:20240806-160803.png}} | ||
+ | |||
+ | When processing a contract renewal: | ||
+ | |||
+ | - Input the End Date for the renewed contract period. | ||
+ | |||
+ | **Important**: | ||
+ | |||
+ | * The Start Date and End Date of the renewal must not overlap with any other versions of the contract. | ||
+ | * This temporal separation maintains clear delineation between contract periods and prevents potential conflicts | ||
+ | |||
+ | Adherence to this protocol is crucial for maintaining accurate contract chronology and ensuring proper version control within the system. | ||
- | Enter in the End Date for the renewal. | ||
----- | ----- | ||
- | **Estimated Volume - Update based on Actuals** | + | **Estimated Volume - Update based on Actuals |
- | To update | + | To update Estimated Volume |
- | {{: | + | |
+ | - Re-enter edit mode for the contract. | ||
+ | - Navigate to the Products screen. | ||
+ | - Select the relevant product rows for volume adjustment. | ||
+ | - Locate and select the "Mass Update" | ||
- | Click the checkbox for Estimated Quantity and select the Actual Data option in the dropdown. | + | This functionality enables bulk volume updates based on either: |
- | {{: | + | * Actual payment data from the previous contract period |
+ | * Established base data metrics | ||
- | This will update the label to Modify by Percent and allow a percentage to be entered. | + | **Note**: The initial save of the renewed contract |
- | To keep the actual volume per product as the new volume on the renewed contract, keep the default percent of 0.00%. | + | |
- | {{: | ||
- | Click Apply to update | + | {{: |
+ | |||
+ | To configure volume calculations in the Mass Update interface: | ||
+ | |||
+ | - Enable the Estimated Quantity option by selecting its corresponding checkbox. | ||
+ | - From the available data source options in the dropdown menu, select either: | ||
+ | |||
+ | This selection determines the reference data that will be used to calculate the new estimated quantities for the selected products. | ||
+ | |||
+ | |||
+ | {{: | ||
+ | |||
+ | Upon selecting the data source, the interface will update as follows: | ||
+ | |||
+ | - The label will change to " | ||
+ | - A field for percentage input will become available. | ||
+ | |||
+ | Percentage Adjustment Options: | ||
+ | |||
+ | a. To maintain current volumes: | ||
+ | * Retain the default value of 0.00% | ||
+ | * This action will carry forward the actual volumes from the selected data source without modification. | ||
+ | |||
+ | b. To implement a volume increase: | ||
+ | * Input the desired percentage increase | ||
+ | * Example: Entering 5.00% will apply a 5% increase to the actual volume of all selected products. | ||
+ | |||
+ | **Note**: The percentage adjustment is uniformly applied to all products selected in the mass update process. | ||
+ | |||
+ | |||
+ | {{: | ||
+ | |||
+ | To finalize the volume adjustments: | ||
+ | |||
+ | - Locate the " | ||
+ | - Click "Apply" | ||
+ | |||
+ | This action will implement the specified percentage adjustment across | ||
+ | |||
+ | **Note**: Ensure all desired products are selected and the correct percentage is entered before applying the changes, as this action will affect all chosen items simultaneously. | ||
+ | |||
+ | |||
+ | |||
+ | {{: | ||
- | {{: | ||
----- | ----- | ||
- | Contract Notes do not carry over, so be sure to add any necessary | + | Contract Notes are not automatically transferred during the renewal process. Therefore: |
+ | |||
+ | - Review the notes from the previous contract version. | ||
+ | - Add all pertinent information to the Notes section of the renewed contract, including: | ||
+ | * Relevant historical context | ||
+ | * Current terms and conditions | ||
+ | * Special considerations | ||
+ | * Other essential documentation | ||
+ | |||
+ | This manual transfer of notes ensures continuity of critical contract information and maintains comprehensive documentation for the renewed agreement. | ||
+ | |||
----- | ----- | ||
- | Click Save in the Actions section at the top right of the screen to save changes. | + | To preserve your modifications: |
- | {{: | + | |
+ | - Select the " | ||
- | To return to the prior version of the contract and cancel the renew process, click Revert. | + | This action |
- | {{:pasted:20181120-135830.png}} | + | |
+ | {{:pasted:20240806-161032.png}} | ||
+ | |||
+ | To cancel the renewal process: | ||
+ | |||
+ | - Select the " | ||
+ | - When prompted by the confirmation dialog, choose one of the following: | ||
+ | * Select " | ||
+ | * Select " | ||
+ | |||
+ | **Note**: This action requires careful consideration as reverting cannot be undone, and all modifications made during the renewal process will be discarded if confirmed. | ||
+ | |||
+ | |||
+ | {{: | ||
---- | ---- | ||
- | When you are ready to submit | + | To initiate |
- | {{:pasted:20150807-172134.png}} | + | - Review all modifications to ensure accuracy and completeness. |
+ | - Locate the " | ||
+ | - Click " | ||
+ | |||
+ | This action will: | ||
+ | |||
+ | * Lock the contract for further edits | ||
+ | * Route the document to the appropriate personnel for review and approval | ||
+ | |||
+ | **Note**: Ensure all necessary changes have been made and saved prior to submission, as further modifications may require additional processes once the approval workflow has begun. | ||
+ | |||
+ | |||
+ | |||
+ | {{:pasted:20240806-161230.png}} | ||
---- | ---- | ||
- | The Contract ID now shows that this is the 1st renewal | + | Contract Version Nomenclature Update: |
+ | |||
+ | Upon submission of a renewal, the Contract ID is automatically revised | ||
+ | |||
+ | R[x].A[y] | ||
+ | ' | ||
+ | ' | ||
+ | ' | ||
+ | ' | ||
+ | |||
+ | In this instance: | ||
+ | |||
+ | * The Contract | ||
+ | - This is the first renewal (R1) | ||
+ | - No amendments have been made to this renewal (A0) | ||
+ | |||
+ | **Note**: For contracts that have undergone neither renewals nor amendments, the Contract ID is appended with "R0.A0". | ||
+ | |||
+ | This systematic versioning provides a clear, chronological record of contract modifications, | ||
- | (Note: for contracts that have no renewals or amendments, the Contract ID is followed by R0.A0.) | + | {{:pasted:20240806-161312.png}} |
- | {{:pasted:20170202-115917.png}} | + | |