User Tools

Site Tools


setting_up_a_new_contract

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
setting_up_a_new_contract [2025/06/18 18:03] tina.roblessetting_up_a_new_contract [2025/06/18 18:11] (current) tina.robles
Line 1571: Line 1571:
   * System Verification: Confirm successful integration of all intended data modifications   * System Verification: Confirm successful integration of all intended data modifications
  
 +{{:pasted:20250618-180418.png}}
 +
 +**__Incomplete Data Handling and Validation Protocols__**
 +
 +__Partial Data Import Processing__
 +
 +**Incomplete Field Management**
 +  * System Behavior: New products with missing required fields trigger "Bad Row" validation warnings
 +  * Import Processing: Despite validation warnings, products are still integrated into the contract configuration
 +  * Data State: Items exist within the contract but remain in incomplete status pending required field completion
 +
 +__Contract Save Validation__
 +
 +**Required Field Verification**
 +  * Save Process: Contract save operation initiates comprehensive data validation
 +  * System Notification: TPM generates reminder messages identifying incomplete required fields
 +  * User Guidance: Clear messaging directs users to specific fields requiring completion
 +  * Save Prevention: Contract cannot be finalized until all required fields are properly populated
 +
 +__Data Integrity Management__
 +
 +**Two-Stage Validation Process:**
 +  * Import Stage: Allows partial data entry with warning notifications
 +  * Save Stage: Enforces complete data requirements for contract finalization
 +
 +**Business Benefits:**
 +  * Workflow Flexibility: Users can import bulk data and complete required fields systematically
 +  * Error Prevention: Multiple validation checkpoints prevent incomplete contract deployment
 +  * Data Quality: Ensures all contracts meet minimum data requirements before activation
 +
 +__User Action Requirements__
 +
 +**Post-Import Tasks:**
 +  * Field Completion: Address all flagged required fields identified during import validation
 +  * Data Review: Verify accuracy and completeness of all imported product information
 +  * Contract Finalization: Complete required fields to enable successful contract save operation
 +
 +{{:pasted:20250618-181026.png}}
  
  
setting_up_a_new_contract.txt · Last modified: 2025/06/18 18:11 by tina.robles