This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| renewing_a_contract [2015/08/07 17:23] – lisa.maloney | renewing_a_contract [2025/02/12 16:57] (current) – tina.robles | ||
|---|---|---|---|
| Line 2: | Line 2: | ||
| - | To renew a contract, open the contract | + | To initiate |
| - | {{:pasted:20150807-171301.png}} | + | - Locate and open the specific contract due for renewal. |
| + | - Navigate to the " | ||
| + | - Select the " | ||
| + | |||
| + | {{:pasted:20240806-160748.png}} | ||
| ---- | ---- | ||
| - | Some fields cannot be changed via the Renew process. For example, you can change dates but you can't change the Contractee. | + | Upon initiating |
| - | {{:pasted:20150807-171708.png}} | + | |
| + | - The Date Information section becomes editable. | ||
| + | - The Contract Name field in the Version Information section is enabled for modification. | ||
| + | - Existing data is carried forward to the renewal, including: | ||
| + | * Product portfolio | ||
| + | * Lump sum items | ||
| + | * Distributor information | ||
| + | * Other relevant contract details | ||
| - | ---- | ||
| - | Click Save in the Actions section at the top right of the screen to save changes. | + | During |
| - | {{:pasted:20150807-172049.png}} | + | * Product catalog: |
| + | * Pricing structure adjustments | ||
| + | * Distributor network modifications: | ||
| + | |||
| + | {{: | ||
| + | |||
| + | When processing a contract renewal: | ||
| + | |||
| + | - Input the End Date for the renewed contract period. | ||
| + | |||
| + | **Important**: | ||
| + | |||
| + | * The Start Date and End Date of the renewal must not overlap with any other versions of the contract. | ||
| + | * This temporal separation maintains clear delineation between contract periods and prevents potential conflicts | ||
| + | |||
| + | Adherence to this protocol is crucial for maintaining accurate contract chronology and ensuring proper version control within the system. | ||
| + | |||
| + | |||
| + | ----- | ||
| + | **Estimated Volume - Update based on Actuals or Base** | ||
| + | |||
| + | To update Estimated Volume calculations based on historical data: | ||
| + | |||
| + | - First, save the renewed contract version. | ||
| + | - Re-enter edit mode for the contract. | ||
| + | - Navigate to the Products screen. | ||
| + | - Select the relevant product rows for volume adjustment. | ||
| + | - Locate and select the "Mass Update" | ||
| + | |||
| + | This functionality enables bulk volume updates based on either: | ||
| + | |||
| + | * Actual payment data from the previous contract period | ||
| + | * Established base data metrics | ||
| + | |||
| + | **Note**: The initial save of the renewed contract is a prerequisite for accessing the mass update functionality. | ||
| + | |||
| + | |||
| + | {{: | ||
| + | |||
| + | To configure volume calculations in the Mass Update interface: | ||
| + | |||
| + | - Enable the Estimated Quantity option by selecting its corresponding checkbox. | ||
| + | - From the available data source options in the dropdown menu, select either: | ||
| + | |||
| + | This selection determines the reference data that will be used to calculate the new estimated quantities for the selected products. | ||
| + | |||
| + | |||
| + | {{: | ||
| + | |||
| + | Upon selecting the data source, the interface will update as follows: | ||
| + | |||
| + | - The label will change to " | ||
| + | - A field for percentage input will become available. | ||
| + | |||
| + | Percentage Adjustment Options: | ||
| + | |||
| + | a. To maintain current volumes: | ||
| + | * Retain the default value of 0.00% | ||
| + | * This action will carry forward the actual volumes from the selected data source without modification. | ||
| + | |||
| + | b. To implement a volume increase: | ||
| + | * Input the desired percentage increase | ||
| + | * Example: Entering 5.00% will apply a 5% increase to the actual volume of all selected products. | ||
| + | |||
| + | **Note**: The percentage adjustment is uniformly applied to all products selected in the mass update process. | ||
| + | |||
| + | |||
| + | {{: | ||
| + | |||
| + | To finalize the volume adjustments: | ||
| + | |||
| + | - Locate the " | ||
| + | - Click " | ||
| + | |||
| + | This action will implement the specified percentage adjustment across all selected products on the contract, updating their estimated quantities accordingly. | ||
| + | |||
| + | **Note**: Ensure all desired products are selected and the correct percentage is entered before applying the changes, as this action will affect all chosen items simultaneously. | ||
| + | |||
| + | |||
| + | |||
| + | {{: | ||
| + | |||
| + | ----- | ||
| + | Contract Notes are not automatically transferred during the renewal process. Therefore: | ||
| + | |||
| + | - Review the notes from the previous contract version. | ||
| + | - Add all pertinent information to the Notes section of the renewed contract, including: | ||
| + | * Relevant historical context | ||
| + | * Current terms and conditions | ||
| + | * Special considerations | ||
| + | * Other essential documentation | ||
| + | |||
| + | This manual transfer of notes ensures continuity of critical contract information and maintains comprehensive documentation for the renewed agreement. | ||
| + | |||
| + | |||
| + | ----- | ||
| + | |||
| + | |||
| + | To preserve your modifications: | ||
| + | |||
| + | - Navigate to the Actions section in the upper right corner of the interface. | ||
| + | - Select the " | ||
| + | |||
| + | This action will secure all changes made to the contract during the current editing session. | ||
| + | |||
| + | |||
| + | {{: | ||
| + | |||
| + | To cancel the renewal process: | ||
| + | |||
| + | - Select the " | ||
| + | - When prompted by the confirmation dialog, choose one of the following: | ||
| + | * Select " | ||
| + | * Select " | ||
| + | |||
| + | **Note**: This action requires careful consideration as reverting cannot be undone, and all modifications made during the renewal process will be discarded if confirmed. | ||
| + | |||
| + | |||
| + | {{:pasted:20240806-161052.png}} | ||
| ---- | ---- | ||
| - | When you are ready to submit | + | To initiate |
| - | {{:pasted:20150807-172134.png}} | + | - Review all modifications to ensure accuracy and completeness. |
| + | - Locate the " | ||
| + | - Click " | ||
| + | |||
| + | This action will: | ||
| + | |||
| + | * Lock the contract for further edits | ||
| + | * Route the document to the appropriate personnel for review and approval | ||
| + | |||
| + | **Note**: Ensure all necessary changes have been made and saved prior to submission, as further modifications may require additional processes once the approval workflow has begun. | ||
| + | |||
| + | |||
| + | |||
| + | {{:pasted:20240806-161230.png}} | ||
| ---- | ---- | ||
| - | Notice | + | Contract Version Nomenclature Update: |
| - | {{:pasted:20150807-172325.png}} | + | |
| + | Upon submission of a renewal, | ||
| + | |||
| + | R[x].A[y] | ||
| + | ' | ||
| + | ' | ||
| + | ' | ||
| + | ' | ||
| + | |||
| + | In this instance: | ||
| + | |||
| + | * The Contract ID now displays "R1.A0", indicating: | ||
| + | - This is the first renewal | ||
| + | - No amendments have been made to this renewal (A0) | ||
| + | |||
| + | **Note**: For contracts that have undergone neither | ||
| + | |||
| + | This systematic versioning provides a clear, chronological record of contract modifications, | ||
| + | |||
| + | |||
| + | {{:pasted:20240806-161312.png}} | ||