User Tools

Site Tools


renewing_a_contract

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
renewing_a_contract [2025/02/12 16:57] – tina.roblesrenewing_a_contract [2026/10/19 18:06] (current) – tina.robles
Line 108: Line 108:
  
 ----- -----
 +
 +**Estimate Lookback Period & Estimate Gap Period**
 +
 + ▪When renewing or amending a contract these fields are now required and a pop up will show if they are not filled out.
 +
 +{{pasted:20261019-180606.png}}
 +
 +-----
 +
 Contract Notes are not automatically transferred during the renewal process. Therefore: Contract Notes are not automatically transferred during the renewal process. Therefore:
  
renewing_a_contract.txt · Last modified: by tina.robles

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki