User Tools

Site Tools


cancelling_a_contract

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
cancelling_a_contract [2025/04/22 18:46] tina.roblescancelling_a_contract [2025/04/22 18:53] (current) tina.robles
Line 63: Line 63:
 {{:pasted:20240806-171029.png}} {{:pasted:20240806-171029.png}}
  
-A cancelled contract cannot be UN-cancelled if there is another contract for that timeframe which is in Draft,  +**Contract Un-Cancellation: Eligibility Criteria** 
-Evaluation or Terminated.  If there is NOT a contract in any of those statuses it can be UN-cancelled.+ 
 +This outlines the conditions and restrictions governing the un-cancellation of contracts within the contract management system. 
 + 
 +__Eligibility Requirements:__ 
 + 
 +The system evaluates existing contracts within the same timeframe for the following statuses: 
 +  * Draft 
 +  * Evaluation 
 +  * Terminated 
 + 
 +Un-Cancellation Conditions 
 +  * Permitted when: No overlapping contracts exist in the specified statuses and the timeframe is clear of conflicting contract states 
 +  * Restricted when: Any overlapping contract exists in Draft statusAny overlapping contract exists in Evaluation status, Any overlapping contract exists in Terminated status 
 + 
 +System Validation: The contract management system automatically performs these validations to maintain data integrity and prevent conflicting contract states. 
 + 
 +**Best Practices:** 
 +  * Review existing contracts within the relevant timeframe before attempting un-cancellation 
 +  * Ensure resolution of any conflicting contract states before proceeding 
 +  * Document the business justification for contract un-cancellation 
 + 
 +Note: This validation process helps maintain the integrity of the contract management system and prevents potential conflicts in contract administration.
  
  
cancelling_a_contract.txt · Last modified: 2025/04/22 18:53 by tina.robles